MAIN MUSEUM GATES
​

In 2016 the main museum electrical and control systems had been in-operational for some 8 years. IVERTECH were appointed to survey the control systems, propose a solution and implement. This work was carried out successfully during operational periods with no impact on museum activities.

​

MAIN LTHW PUMPS
​

In 2016 The Museum existing LTHW pumps were nearing 40 years old. IVERTECH were appointed as a supply chain partner to survey, strip out, replace and commission the main pumps serving 2/3 of the Museum heating system. This work was carried out successfully during operational periods with no impact on Museum activities.